Background

It is projected by the Jordan Ministry of Energy that the primary energy growth demand from 2008 to 2020 is expected to be 5.5%. The country currently imports nearly 97% of its energy needs namely through oil and gas. The expected amount of energy results in 15 million tons of oil equivalent to be needed by 2020. Additionally, the existing electricity costs in Jordan range from $0.22 to $0.42 per kWh for residential to commercial consumers.

In 2007, the Ministry issued a National Energy Strategy that targets 7% of electricity production from renewables by 2015 and 10% by 2020. Due to this strategy, coupled with the recent removal of the net metering renewable capacity limit of 5 MW, will greatly increase the opportunity for new projects to be developed with the approval of the transmission provider (NEPCO) or distribution provider (JPSCO, IDECO, EDCO).

Picture of country of Jordan

Approach

Due to the increased penetration of renewable energy to meet the energy targets, challenges will arise due to the lack of existing infrastructure to support the change in a generation. Forecasting and dispatch tools were needed to optimally dispatch the added renewable energy.

  • Increased discussions
    • on Interconnection Agreements (IA) and Power Purchasing Agreements (PPA) require careful attention.
  • Study impacts
    • of renewable generation on the system and properly plan infrastructure to support renewables.
  • Cost of integration
    • of large projects on transmission and impact on the operation and need for recovery mechanisms and introduction of wheeling.

Outcome

  • Recommendations to NEPCO for IRR forecasting, unit commitment and dispatch, project scheduling and communication with National Load Control Center (NCC).
  • Provided guidance and template on technical language to include in future PPA while in transition to new IRR Grid Code.
  • Educated and provided on-site support to the NEPCO engineers for creating and revising IRR operating protocols and testing and commissioning procedures.
  • Provided on-site training to NEPCO engineers for completing IRR testing for Tafila wind project prior to approving interconnection.
  • Provided on-site training to NEPCO engineers for completing and reviewing GIS for IRRs.
  • Facilitated meetings between NEPCO and IRR developers to resolve any questions related to PPAs, testing and commissioning, technical capabilities, and operations for the Tafila wind project.

Want to learn more about our solutions?

When you partner with EPE, you get an experienced team dedicated to providing you with tailored solutions and expert guidance.

Please fill out the form to the right, and a member of our team will be in touch.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.